Vue de la page 36
Figure 17 CM TUI show devicebay command
As an example of what can happen when the configuration of a Blade Link Domain is changed,
consider the case where the configuration above is changed to AAAA. After the change, the
Server Profiles screen shows profile Test1 assigned to the 4-blade server and profile Test2 is
assigned to a “COVERED-AUXILIARY” blade. This is because this profile is assigned to bay
3 which is now an auxiliary blade in the BL890c i4 server. Also note that the 4-blade server
is in a non-partitioned state and is therefore not identified as being an nPar.
Figure 18 Blade Link Domain Configuration Change Example (Server Profiles Screen)
The Device Bays display now shows bays 1-4 as a server with profile Test1 assigned.
Assigning a VC profile to an nPar 37
Vue de la page 36