Hp ProLiant DL580 G7 Server Manuel d'utilisateur Page 66

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 131
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 65
Hardware options installation 66
10.
Secure the 10G NIC connectors to the chassis with the retaining screw.
11. Install the RJ-45 plugs on the bottom two RJ-45 connectors on the rear panel.
12. Install the access panel.
13. Slide the server back into the rack.
14. Connect the network cables.
15. Power up the server (on page 25).
Battery-backed write cache module
The HP BBWC protects against hard boot, power, controller, and system board failures. The server supports
the following battery-backed options:
256-MB cache module (standard)
512-MB cache module (optional)
Vue de la page 65
1 2 ... 61 62 63 64 65 66 67 68 69 70 71 ... 130 131

Commentaires sur ces manuels

Pas de commentaire