HP 10-Base-T Manuel d'installation Page 31

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 54
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 30
2-7
Troubleshooting
Troubleshooting
Running Connectivity Tests
Both the hub and cabling can be tested by running an end-to-end communica-
tions test—a test that sends known data from one network device to another
through the hub—such that you can verify that the data was correctly trans-
mitted between the devices. Through both the ASCII Console Interface and
the Browser Interface, you can run the following hub-to-node connectivity
tests:
Link Test. A test of the link layer (MAC Address) connection between a local
device and a designated remote device.
Ping Test. A test of the network layer (IP Address) path between the managed
device and another device on an IP network that responds to IP packets.
Figure 2-2. Running a Connectivity Test
See your LAN adapter’s manual for information on running an end-to-end
communication test.
PC responding to
the test packets
PC sending
test packets
Vue de la page 30
1 2 ... 26 27 28 29 30 31 32 33 34 35 36 ... 53 54

Commentaires sur ces manuels

Pas de commentaire