HP 40cp Manuel d'installation Page 1

Naviguer en ligne ou télécharger Manuel d'installation pour Unités de distribution d'électricité (PDU) HP 40cp. HP 40cp Setup and Install Manuel d'utilisatio

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer

Résumé du contenu

Page 1 - (40 ft)

HP Performance-Optimized Datacenter, 12 m (40 ft) Site Requirements Information Part Number 513171-002 March 2010 (Second Edition)

Page 2 - Intended audience

HP POD specifications 10 Water input side view Callout Feature 1 CWR/CWS portal 2.7 m (9 ft) 2 IT cable portals 2 m (7 ft) 3 Central facility

Page 3 - Contents

HP POD specifications 11 External hot aisle view Water supply specifications Feature Specification Facility input temperature to HP POD 12º to

Page 4 - Site requirements

Water quality requirements 12 Water quality requirements Water quality requirements and specifications • Closed-loop water must not contain any lim

Page 5 - System utilities

Water quality requirements 13 Piping materials Do not use the following interconnecting piping materials in a closed water system: • Oxidizing bioc

Page 6 - Environmental specifications

Power management 14 Power management Connection requirements When determining the final location of your power and water connections, consider the d

Page 7 - Lightning protection

Power management 15 Standard density HP POD with redundant power Component Quantity Phases Amps Volts Description Primary feeders 2 3 225

Page 8 - HP POD specifications

Power management 16 High density HP POD The high density HP POD must be supplied with six feeders. • 3-phase • 380 to 415V wye connected • 50 to

Page 9 - Required clearances

Power management 17 Component Quantity Phases Amps Volts Description the HP POD. Primary feeders 3 3 225 415/240 Supply power path to IT e

Page 10

Supported facility connections 18 Supported facility connections Humidifier specifications A dedicated supply of domestic water is required if the o

Page 11 - Water supply specifications

Supported facility connections 19 IMPORTANT: For full protection, you must ground the HP POD, power distribution components and the water distribu

Page 12 - Water quality requirements

© Copyright 2009, 2010 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice. The only warr

Page 13 - Condensation management

Supported facility connections 20 The HP POD ECS offers: • The ability to monitor the status of water and air temperatures, water pressures, and wa

Page 14 - Power management

Acronyms and abbreviations 21 Acronyms and abbreviations ASSD air sampling smoke detector BMS building management system ECS environmental control

Page 15

Contents Site requirements ...

Page 16 - High density HP POD

Site requirements 4 Site requirements About this document This document outlines the installation requirements for a 12 m (40 ft) HP POD. These guid

Page 17 - HP POD control power

Site requirements 5 • You have chilled water at your final location. • You have made provisions for properly grounding the HP POD. System utiliti

Page 18 - Humidifier specifications

Site requirements 6 Drainage Item Component 1 Heat exchanger condensate drains 2 Water main supply/return drain 3 Humidifier drain Optional

Page 19 - HP POD security

Site requirements 7 Features Specifications temperature* Operating humidity • 0% to 100% relative noncondensing Non-operating humidity* • 5 to 95

Page 20

HP POD specifications 8 HP POD specifications Dimensions The HP POD is approximately 12.2 m (40 ft) long, 2.4 m (8 ft) wide, and 2.9 m (9.5 ft) tall

Page 21 - Acronyms and abbreviations

HP POD specifications 9 Item Component 4 Fan control panel 5 Redundant relay panel 6 House panels 7 Main input power junction boxes 8 Security

Commentaires sur ces manuels

Pas de commentaire