Hp 3PAR Operating System Software Manuel d'utilisateur Page 348

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 424
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 347
Tasks & Schedules Manager
Common Actions Panel Contains options for creating a schedule to create a virtual
copy, create a consistency group virtual copy, compact a common provisioning group,
or adaptive optimization
The Toolbar Contains options to create a schedule and to edit, suspend, resume, and
remove a schedule. At least one row in the table displayed in the Management Window
must be selected to enable the Edit, Suspend, Resume, and Remove actions. These four
actions will also be on the table right-click popup menu.
Common Schedule Panel The schedule panel is a common panel that is embedded across
all dialogs and wizards for operations that can be scheduled. For example, if you choose to
create a virtual copy from the Common Actions Panel under the Provisioning Manger, the
Create Virtual Copy dialog box gives you the option of either creating the virtual copy
immediately or selecting a time to schedule the creation. For more information, see “The
Common Schedule Panel” (page 349).
348 Tracking and Scheduling Tasks
Vue de la page 347
1 2 ... 343 344 345 346 347 348 349 350 351 352 353 ... 423 424

Commentaires sur ces manuels

Pas de commentaire