Hp Dynamic Smart Array Controllers Manuel d'utilisateur Page 9

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 37
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 8
Enabling and configuring the controller 9
1.
Power down the server.
2. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
3. Remove the access panel.
4. Remove all components as needed to access the FBWC module and capacitor pack.
5. Connect the capacitor pack cable to the cache module.
CAUTION: When connecting or disconnecting the capacitor pack cable, the connectors on the
cache module and cable are susceptible to damage. Avoid excessive force and use caution to
avoid damage to these connectors.
6. Install the cache module in the cache module connector on the system board.
For more information on the location of the cache module connector, see the server user guide.
7. Install the FBWC capacitor pack.
8. Install all previously removed components.
Vue de la page 8
1 2 3 4 5 6 7 8 9 10 11 12 13 14 ... 36 37

Commentaires sur ces manuels

Pas de commentaire