Hp Parallel Uninterruptible Power System Manuel d'utilisateur Page 15

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 115
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 14
UPS installation 15
CAUTION: Always plan the rack installation so that the heaviest item is on the bottom of the rack.
Install the heaviest item first, and continue to populate the rack from the bottom to the top.
NOTE: Mounting hardware for square- and round-holed racks is included in the UPS kit.
1. Select the proper holes in the rack for positioning the UPS in the rack.
The UPS rails are installed in positions 1 and 12.
2. Loosen the hex nuts, and extend the brackets to the desired length.
Vue de la page 14
1 2 ... 10 11 12 13 14 15 16 17 18 19 20 ... 114 115

Commentaires sur ces manuels

Pas de commentaire