Hp ProLiant DL385p Gen8 Server Manuel d'utilisateur Page 29

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 135
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 28
Operations 29
5.
If a full-length expansion board is installed in slot 1, release the full-length expansion board retainer,
and then remove the primary PCIe riser cage.
6. If a full-length expansion board is installed in slot 4, release the full-length expansion board retainer,
and then remove the secondary PCIe riser cage.
7. Remove the full-length expansion board.
To install the component, reverse the removal procedure.
Remove the primary PCIe riser cage
CAUTION: To prevent damage to the server or expansion boards, power down the server and
remove all AC power cords before removing or installing the PCIe riser cage.
1. Power down the server (on page 23).
2. Remove all power:
Vue de la page 28
1 2 ... 24 25 26 27 28 29 30 31 32 33 34 ... 134 135

Commentaires sur ces manuels

Pas de commentaire