Hp ProLiant ML10 Server Manuel d'utilisateur Page 14

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 76
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 13
Operations 14
2.
The server powers down and enters standby mode. The system power LED changes from green to
amber. Power is still applied to the server.
3. Disconnect the power cord from the power source.
4. Disconnect the power cord from the server.
5. Remove the access panel (on page 12).
6. Remove the front bezel.
Install the front bezel
1. Insert the tabs on the front bezel into the slots on the front chassis.
2. Close the front bezel.
Install the access panel
Vue de la page 13
1 2 ... 9 10 11 12 13 14 15 16 17 18 19 ... 75 76

Commentaires sur ces manuels

Pas de commentaire