Hp ProLiant ML110 G7 Server Manuel d'utilisateur Page 28

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 113
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 27
Setup 28
CAUTION: To prevent damage to equipment, do not place the monitor on a rack-mounted
server. The rack enabling kit supports only the server.
5. Slide the tray fully into the rack, and then tighten the thumbscrews.
6. Slide the locking bracket forward, and then tighten the thumbscrews.
Powering up and configuring the server
To power up the server, press the Power On/Standby button.
While the server boots, RBSU and the ORCA utility are automatically configured to prepare the server for
operating system installation.
To configure these utilities manually:
Press the F8 key when prompted during the array controller initialization to configure the array
controller using ORCA.
Vue de la page 27
1 2 ... 23 24 25 26 27 28 29 30 31 32 33 ... 112 113

Commentaires sur ces manuels

Pas de commentaire