Hp ProLiant ML310e Gen8 Server Manuel d'utilisateur Page 51

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 107
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 50
Hardware options installation 51
10.
If installing a full-length expansion board, install back the board retainer.
11. Install the expansion slot cover retainer.
12. Connect all necessary internal and external cables to the expansion board. For more information on
these cabling requirements, see the documentation that ships with the option.
13. Install the air baffle (on page 22).
14. Install the access panel (on page 21).
15. Lock the tower bezel.
16. Connect each power cord to the server.
17. Connect each power cord to the power source.
18. Power up the server (on page 18).
Vue de la page 50
1 2 ... 46 47 48 49 50 51 52 53 54 55 56 ... 106 107

Commentaires sur ces manuels

Pas de commentaire