HP Modular Cooling System Guide de démarrage rapide Page 80

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 93
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 79
Facility planning for implementation 80
Be sure the chilled water source is on and flowing prior to the start-up of an MCS-200/100.
Be sure the MCS-200/100 is operational and running before turning on the servers and closing the
front and rear cabinet doors.
For more information on the installation of the HP Modular Cooling System 200/100, see the HP Modular
Cooling System 200/100 Installation Guide.
Vue de la page 79
1 2 ... 75 76 77 78 79 80 81 82 83 84 85 ... 92 93

Commentaires sur ces manuels

Pas de commentaire