Hp Insight Management-Software Manuel d'utilisateur Page 70

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 113
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 69
poweroff devicebay
The -poweroff devicebay command sends a power-off request to Virtual Connect Manager
for a given bay.
Syntax
-poweroff devicebay enclosurename <enclosurename> bayname <bayname>
[-force|-forceontimeout]
Parameters
Table 29 Parameter descriptions for -poweroff devicebay
OptionalRequiredDescriptionParameter
xSpecifies the name of the
enclosure that contains the
bay to be powered off.
-enclosurename
xSpecifies the name of the
bay to be powered off.
NOTE: For a multiblade
server, the bay name must
be the name of the primary
bay.
-bayname
xForces a power-off operation
without waiting for the OS
-force
to shut down normally. This
option should be used only
as a last resort because it
can cause data loss on the
server.
xAttempts a normal power off
operation, but if the server
-forceontimeout
does not power off within
the timeout period (default
is 3600 seconds), it is
forced to power off.
Output
The result of the power-off operation. If nb is in effect for the command, nothing is returned, and
you can verify the results of the command by polling -show power-status for the enclosure
bay.
Examples
Conduct a normal power-off operation on device bay 2 of an enclosure that has the ID enc0:
vcemcli -poweroff -enclosurename enc0 bayname 2
Conduct a forced power-off operation on device bay 2 of an enclosure that has the ID enc0:
vcemcli -poweroff enclosurename enc0 bayname 2 force timeout
300
70 Using VCEM commands
Vue de la page 69
1 2 ... 65 66 67 68 69 70 71 72 73 74 75 ... 112 113

Commentaires sur ces manuels

Pas de commentaire