Hp ProLiant SL390s G7 Server Manuel d'utilisateur Page 30

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 87
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 29
Hardware options installation 30
CAUTION: To prevent possible server overheating, always populate processor socket 2 with a
processor and a heatsink or a processor socket cover and a heatsink blank.
IMPORTANT: Processor socket 1 must be populated at all times or the server does not function.
To install the component:
1. Power down the server (on page 18).
2. Disconnect all peripheral cables from the server.
3. Remove the server from the chassis ("Removing the server from the chassis" on page 18).
CAUTION: Failure to completely open the processor locking lever prevents the processor from
seating during installation, leading to hardware damage.
4. Open the processor locking lever and the processor socket retaining bracket. Do not remove the
processor socket cover.
IMPORTANT: Be sure the processor remains inside the processor installation tool.
Vue de la page 29
1 2 ... 25 26 27 28 29 30 31 32 33 34 35 ... 86 87

Commentaires sur ces manuels

Pas de commentaire