
(Optional) Sensor Base Stations 57
Energy Base Station installation diagram
Callout Component Description
1
Energy meter Energy meter(with housing case removed) you want to measure
2
RS-485 (+ terminal) RS-485 (+)
3
RS-485 (- terminal) RS-485 (-)
4
RS-485 (ground/shield) RS-485 (ground wire)
5
RS-485 bus terminating
resistor
If a single energy meter is connected to the Modbus base station, the
terminating resistor must be installed.
If multiple energy meters are connected to the Modbus base station,
in a daisy chain, the terminating resistor is installed only on the last
energy meter.
6
RS-485 wire RS-485 wire routed from the energy meter to the Modbus base station
7
Modbus base station Transmits data from the energy meter to the Edge server via Ethernet
8
RJ-45 Ethernet connector Connects to Ethernet network
9
AC power connector Connects to power source
10
Modbus adapter (RJ-45 to
DB-9)
Connection point between the energy meter and the Modbus base
station
Programming the ION power meter
You must be standing at the ION power meter to program the device. It is not capable of remote
programming.
1. Press and hold the UP and DOWN arrows simultaneously for a minimum of 2 seconds to access the
programming mode.
2. Press the KVARh button to scroll through the available modes.
3. Press and hold the UP or DOWN arrow for a minimum of 2 seconds to move from digit to digit when
adjusting values.
Commentaires sur ces manuels