Power up procedure 71
1.
During the initial power up mode and after the initial bootup LED sequence, the LED on the base station
flashes red while attempting to find and connect to the gateway.
2. When the base station is connected, the LED flashes green indicating that it is communicating with the
gateway.
3. When the base station is identified by the gateway, it stops flashing and begins working in operating
mode. The LED on the base station is off.
The initial power up mode only lasts approximately 5 to 10 minutes.
• If the LED is still flashing red after 10 minutes:
o Verify that the gateway is powered up and connected to the network.
o Verify that all the HP Insight Environmental Observer software components are installed and running
properly.
• If the LED is still flashing green after 10 minutes, verify that the deployment lab configuration was
properly exported.
• If the LED is flashing yellow, the base station is not in the correct operating mode. Toggle the power
button three times, (On, Off, On, Off, On) with a maximum of 1 to 2 seconds between each toggle.
Commentaires sur ces manuels